H2Prism
Hydrogen calculators & data

Petrobrazi Refinery H2 2

South - Muntenia Region; 65 Trandafirilor Street, Brazi Commune, Prahova County

Overview

StatusConceptEuropean Clean Hydrogen Partnership · as of 2025
Country · regionSouth - Muntenia Region; 65 Trandafirilor Street, Brazi Commune, Prahova CountyOMV Petrom
TechnologyWater electrolysisOMV
Capacity35 MWOMV Petrom

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.

Details

Technology & product

Final Usesustainable aviation fuels (SAF), diesel bio-components - hydrogenated vegetable oil (HVO)OMV
Power Sourcerenewable sourcesOMV
Project Typegreen hydrogen production installation through water electrolysisOMV Petrom

Capacity & economics

FinancingTotal Proposed Amount: 480,443,093 lei; Maximum Non Reimbursable Amount: 142,665,500 leiOMV Petrom

Timeline

No recorded project events.

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NamePetrobrazi Refinery H2 2
View exact valuePetrobrazi Refinery H2 2
European Hydrogen Observatory projects Dec2025——
Administrative AreaSouth - Muntenia Region; 65 Trandafirilor Street, Brazi Commune, Prahova County
View exact valueSouth - Muntenia Region; 65 Trandafirilor Street, Brazi Commune, Prahova County
NRRP - Green H2 - 35 MW | OMVPetrom.com—
Final Usesustainable aviation fuels (SAF), diesel bio-components - hydrogenated vegetable oil (HVO)
View exact value["sustainable aviation fuels (SAF)","diesel bio-components - hydrogenated vegetable oil (HVO)"]
OMV Petrom signs financing through the National Recovery and Resilience Plan (NRRP) for two green hydrogen production projects at Petrobrazi refinery | OMV.com; NRRP - Green H2 - 35 MW | OMVPetrom.comOlder value
Power Sourcerenewable sources
View exact valuerenewable sources
OMV Petrom signs financing through the National Recovery and Resilience Plan (NRRP) for two green hydrogen production projects at Petrobrazi refinery | OMV.com; NRRP - Green H2 - 35 MW | OMVPetrom.comOlder value
Project Typegreen hydrogen production installation through water electrolysis
View exact valuegreen hydrogen production installation through water electrolysis
NRRP - Green H2 - 35 MW | OMVPetrom.com—
TechnologyWater electrolysis
View exact valueWater electrolysis
OMV Petrom signs financing through the National Recovery and Resilience Plan (NRRP) for two green hydrogen production projects at Petrobrazi refinery | OMV.com; NRRP - Green H2 - 35 MW | OMVPetrom.comOlder value
Capacity35 MW
View exact value35 MW
Hydrogen - NRRP | OMVPetrom.com; NRRP - Green H2 - 35 MW | OMVPetrom.comOlder value
FinancingTotal Proposed Amount: 480,443,093 lei; Maximum Non Reimbursable Amount: 142,665,500 lei
View exact value{"currency":"lei","total_proposed_amount":480443092.91,"non_reimbursable_currency":"lei","maximum_non_reimbursable_amount":142665500}
NRRP - Green H2 - 35 MW | OMVPetrom.com; NRRP - Green H2 - 35 MW | OMVPetrom.comOlder value
Progress StatusConcept
View exact valueannounced_or_planned
European Hydrogen Observatory projects Dec2025——

Record history

0 current sourced values · 8 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.