- Capacity
- —
- Target operation
- —
- Technology
- —
- Country
- —
- Development stage
- Operational
Project details
- Process description
- MFE110
Sources (3)
- CPH2 completes Site Acceptance Tests in Belfast
Clean Power Hydrogen PLC · As of 2025-05-07
Original value: Final Level 3 SAT completed; MFE110 operational at customer site as reported 7 May 2025
Original value: Belfast (Site: Belfast)
Original value: MFE110
Original value: Northern Ireland Water site, Belfast (Site: Northern Ireland Water site, Belfast)
Original value: operational on a customer site
Original value: Operational
- Clean Power Hydrogen PLC
Clean Power Hydrogen PLC
Original value: Final Level 3 SAT completed; MFE110 operational at customer site as reported 7 May 2025
Original value: MFE110
Original value: Northern Ireland Water site, Belfast (Site: Northern Ireland Water site, Belfast)
- CPH2 completes Site Acceptance Tests in Belfast
Clean Power Hydrogen PLC
Original value: operational on a customer site
Original value: Final Level 3 SAT completed; MFE110 operational at customer site as reported 7 May 2025