Limestone Green Hydrogen Production Project
PEM
On hold
- Capacity
- —
- Target operation
- 2026
- Technology
- PEM
- Country
- —
- Development stage
- On hold
Target operation
- 2024
- 2025
- 2026
- 2027
- 2028
Target year as recorded for this project. The axis does not imply stage history.
Project details
- Electricity source
- Wind
- Site
- 2264 FM209, Graham; unincorporated Young County, Texas
Sources (4)
- Final Environmental Assessment Limestone Green Hydrogen Production Project, DOE/EA-2281
U.S. Department of Energy Loan Programs Office
Original value: Construction is currently paused
Original value: 2026
Original value: 45 tpd of liquefied hydrogen (Liquid hydrogen design)
Original value: PEM electrolyser (Technology: PEM electrolyser)
- Final Environmental Assessment Limestone Green Hydrogen Production Project, DOE/EA-2281
U.S. Department of Energy Loan Programs Office · As of 2025-01
Original value: 2026
Original value: PEM electrolyser (Technology: PEM electrolyser)
Original value: Wind (Electricity source: Wind)
Original value: Construction paused as reported in January2025 EA; initial works existed but manufacturing installation remained planned, no current2026 state inferred
Original value: On hold
Original value: 2264 FM209, Graham; unincorporated Young County, Texas (Site: 2264 FM209, Graham; unincorporated Young County, Texas)
- U.S. Department of Energy Loan Programs Office
U.S. Department of Energy Loan Programs Office
Original value: Construction paused as reported in January2025 EA; initial works existed but manufacturing installation remained planned, no current2026 state inferred
- Plug Power Form10-Q quarter endedJune30,2026
GL-005:LCF01-S01
Original value: land and remaining interconnection asset sale not yet closed
Related projects
Projects sharing a recorded country or technology.