Project details
- Reported size
- 500kW electrolyser in western Sydney
Sources (5)
- ARENA
ARENA
Original value: 500kW electrolyser in western Sydney
- Jemena Power to Gas Demonstration
ARENA · As of 2026-04-17
Original value: 500kW electrolyser in western Sydney
- Jemena
Jemena
Original value: Decommissioned
Original value: Trial concluded; facility no longer operational
- Western Sydney Hydrogen Hub
Jemena
Original value: Decommissioned
Original value: these trial activities have concluded and the facility is no longer operational
Original value: Trial concluded; facility no longer operational
- Jemena Power to Gas Demonstration
ARENA
Original value: project was completed on 15 September 2023
Sources (2)
- Jemena Power to Gas Demonstration
ARENA · As of 2026-04-17
Original value: Location
- ARENA
ARENA
Original value: Location
Projects in Australia
Major projects: operating and FID first, then by recorded capacity.