Overview
StatusConceptEuropean Clean Hydrogen Partnership · as of 2025
Country · regionDeutschland (Germany)Landesnahverkehrsgesellschaft Niedersachsen mbH (LNVG) · Niedersachsen (Lower Saxony)Landesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
TechnologyWater electrolysisEuropean Clean Hydrogen Partnership · as of 2025Wasserstoff-Brennstoffzellenantrieb (hydrogen fuel-cell propulsion)Landesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
Capacity3.89 MWEuropean Clean Hydrogen Partnership · as of 2025
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Technology & product
Carbon Reduction1.6 million litres diesel/year avoided; 4,400 tonnes CO2/year avoidedLandesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
Components14 Coradia iLint hydrogen regional trains; Linde hydrogen refuelling stationLandesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
Configuration Detail14 trains replace 15 diesel trains; refuelled daily and around the clock at Bremervörde stationLandesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
Final Useplanmäßiger Personenverkehr / passenger rail serviceLandesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
Power SourceWasserstoffEisenbahnen und Verkehrsbetriebe Elbe-Weser GmbH (evb)
Power Source DetailPhase 1: hydrogen by-product from chemical production in Stade, transported by 2–3 trailers/day; later on-site electrolysis plannedLandesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
Project GroupLNVG-ProjektLandesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
Project TypeSchienenpersonennahverkehr (SPNV) / passenger railLandesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
Status & timeline
Operating Leveldaily passenger operation on 123 km network; hydrogen trains daily deployedLandesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
Phase SequencePhase 1 by-product supply; Phase 2 on-site electrolysis planned; Phase 3 increasing green hydrogen up to 95% targetedLandesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
EventPassenger operation started 24 August 2022Landesnahverkehrsgesellschaft Niedersachsen mbH (LNVG)
Location & names
Site NameBremervördeAlstom
Timeline
No recorded project events.
Sources & record history
Sources
- European Hydrogen Observatory projects Dec2025 Shared by 4 fields: Snapshot 2025-12-01 · Confidence: reported · Older value (2025)
- Alstom Weltweit erste Wasserstofftankstelle für Passagierzüge entsteht in Bremervörde
- Landesnahverkehrsgesellschaft Niedersachsen mbH (LNVG) WASSERSTOFF — Weltpremiere Wasserstoff Shared by 13 fields: Older value
- Eisenbahnen und Verkehrsbetriebe Elbe-Weser GmbH (evb) Wasserstoffzug-Weltpremiere im evb-Netz
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | HRS Bremervörde - trains | View exact valueHRS Bremervörde - trains | European Hydrogen Observatory projects Dec2025 | — | — |
| Site Name | Bremervörde | View exact valueBremervörde | Weltweit erste Wasserstofftankstelle für Passagierzüge entsteht in Bremervörde | Older value | |
| Administrative Area | Niedersachsen (Lower Saxony) | View exact valueNiedersachsen (Lower Saxony) | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Country | Deutschland (Germany) | View exact valueDeutschland (Germany) | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Carbon Reduction | 1.6 million litres diesel/year avoided; 4,400 tonnes CO2/year avoided | View exact value1.6 million litres diesel/year avoided; 4,400 tonnes CO2/year avoided | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Components | 14 Coradia iLint hydrogen regional trains; Linde hydrogen refuelling station | View exact value14 Coradia iLint hydrogen regional trains; Linde hydrogen refuelling station | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Configuration Detail | 14 trains replace 15 diesel trains; refuelled daily and around the clock at Bremervörde station | View exact value14 trains replace 15 diesel trains; refuelled daily and around the clock at Bremervörde station | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Final Use | planmäßiger Personenverkehr / passenger rail service | View exact valueplanmäßiger Personenverkehr / passenger rail service | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Power Source | Wasserstoff | View exact valueWasserstoff | Wasserstoffzug-Weltpremiere im evb-Netz | Older value | |
| Power Source Detail | Phase 1: hydrogen by-product from chemical production in Stade, transported by 2–3 trailers/day; later on-site electrolysis planned | View exact valuePhase 1: hydrogen by-product from chemical production in Stade, transported by 2–3 trailers/day; later on-site electrolysis planned | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Project Group | LNVG-Projekt | View exact valueLNVG-Projekt | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Project Type | Schienenpersonennahverkehr (SPNV) / passenger rail | View exact valueSchienenpersonennahverkehr (SPNV) / passenger rail | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Technology | Water electrolysis | View exact valueWater electrolysis | European Hydrogen Observatory projects Dec2025 | — | — |
| Technology | Wasserstoff-Brennstoffzellenantrieb (hydrogen fuel-cell propulsion) | View exact valueWasserstoff-Brennstoffzellenantrieb (hydrogen fuel-cell propulsion) | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Capacity | 3.89 MW | View exact value3.89 MW | European Hydrogen Observatory projects Dec2025 | — | — |
| Event | Passenger operation started 24 August 2022 | View exact valuePassenger operation started 24 August 2022 | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Operating Level | daily passenger operation on 123 km network; hydrogen trains daily deployed | View exact valuedaily passenger operation on 123 km network; hydrogen trains daily deployed | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Phase Sequence | Phase 1 by-product supply; Phase 2 on-site electrolysis planned; Phase 3 increasing green hydrogen up to 95% targeted | View exact valuePhase 1 by-product supply; Phase 2 on-site electrolysis planned; Phase 3 increasing green hydrogen up to 95% targeted | WASSERSTOFF — Weltpremiere Wasserstoff | — | |
| Progress Status | Concept | View exact valueannounced_or_planned | European Hydrogen Observatory projects Dec2025 | — | — |
Record history