HIF Tasmania
Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionAustraliaInternational Energy Agency · as of 2026 · Burnie Local Government Area
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
Producte-methanol
CapacityPlanned electrolysis capacity: up to 280 MW
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.
Details
Technology & product
Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Capacity & economics
Production Volumeanticipated 200,000 tons of e-methanol per year
Additional project information
Administrative AreaBurnie, TasmaniaInternational Energy Agency · as of 2026
ProductMeOHInternational Energy Agency · as of 2026
Capacity (Announced Size)280International Energy Agency · as of 2026
Capacity (Nm³ H₂/h)62,222 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (MWel)280 MWelInternational Energy Agency · as of 2026
Capacity (kt H2/y)48.5 kt H2/yInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- HIF Asia Pacific Pty Ltd; EPA Tasmania document host HIF Tasmania e-Fuels Facility Notice of Intent
- TasNetworks TasNetworks Annual Planning Report 2025 Shared by 2 fields: Current
- HIF Asia Pacific Pty Ltd (EPA Tasmania-hosted original Notice of Intent) HIF Asia Pacific Pty Ltd Notice of Intent — HIF Tasmania e-Fuels Facility
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | HIF Tasmania | View exact valueHIF Tasmania | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Burnie Local Government Area | View exact valueBurnie Local Government Area | HIF Tasmania e-Fuels Facility Notice of Intent | Current | |
| Country | Australia | View exact valueAustralia | IEA Hydrogen Projects dataset | — | — |
| Configuration Detail | Unknown PtX | View exact valueUnknown PtX | IEA Hydrogen Projects dataset | — | — |
| Product | e-methanol | View exact valuee-methanol | TasNetworks Annual Planning Report 2025 | — | |
| Technology | Other Electrolysis | View exact valueOther Electrolysis | IEA Hydrogen Projects dataset | — | — |
| Capacity | Planned electrolysis capacity: up to 280 MW | View exact valuePlanned electrolysis capacity: up to 280 MW | HIF Asia Pacific Pty Ltd Notice of Intent — HIF Tasmania e-Fuels Facility | Current | |
| Production Volume | anticipated 200,000 tons of e-methanol per year | View exact valueanticipated 200,000 tons of e-methanol per year | TasNetworks Annual Planning Report 2025 | — | |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Burnie, Tasmania | View exact valueBurnie, Tasmania | IEA Hydrogen Projects dataset | — | — |
| Product | MeOH | View exact valueMeOH | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 280 | View exact value280 | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 62,222 Nm³ H₂/h | View exact value62222.222222222226 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (MWel) | 280 MWel | View exact value280 MWel | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 48.5 kt H2/y | View exact value48.510933333333334 kt H2/y | IEA Hydrogen Projects dataset | — | — |
Record history
4 current sourced values · 4 older values · Record updated