Hidrógeno Verde Bahía Quintero
Overview
StatusFeasibilityInternational Energy Agency · as of 2026
Country · regionChileInternational Energy Agency · as of 2026 · Valparaíso Region, Chile
TechnologyALKInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity10 MWInternational Energy Agency · as of 2026
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Capacity & economics
Production VolumePlanned initial output of 660 tonnes of hydrogen per year, potentially increasing to a maximum of around 1,600 tonnes per year (31 August 2023)
Status & timeline
Date online (tracker field)2027 (meaning under review)International Energy Agency · as of 2026
Additional project information
Administrative AreaRandom location in ValparaisoInternational Energy Agency · as of 2026
Capacity (Announced Size)10 MWInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)2,174 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (kt H2/y)1.69 kt H2/yInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 11 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- www.gnlquintero.com GNL Quintero, Acciona Energía y Enagás Renovable inician evaluación ambiental de proyecto de Hidrógeno Verde en la bahía de Quintero Shared by 2 fields: Current
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Hidrógeno Verde Bahía Quintero | View exact valueHidrógeno Verde Bahía Quintero | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Valparaíso Region, Chile | View exact valueValparaíso Region, Chile | GNL Quintero, Acciona Energía y Enagás Renovable inician evaluación ambiental de proyecto de Hidrógeno Verde en la bahía de Quintero | — | |
| Country | Chile | View exact valueChile | IEA Hydrogen Projects dataset | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | ALK | View exact valueALK | IEA Hydrogen Projects dataset | — | — |
| Capacity | 10 MW | View exact value10 MW | IEA Hydrogen Projects dataset | — | — |
| Production Volume | Planned initial output of 660 tonnes of hydrogen per year, potentially increasing to a maximum of around 1,600 tonnes per year (31 August 2023) | View exact valuePlanned initial output of 660 tonnes of hydrogen per year, potentially increasing to a maximum of around 1,600 tonnes per year (31 August 2023) | GNL Quintero, Acciona Energía y Enagás Renovable inician evaluación ambiental de proyecto de Hidrógeno Verde en la bahía de Quintero | — | |
| Event | Date online : 2027 | View exact value{"date":"2027","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"} | IEA Hydrogen Projects dataset | — | — |
| Progress Status | Feasibility | View exact valueFeasibility study | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Random location in Valparaiso | View exact valueRandom location in Valparaiso | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 10 MW | View exact value10MW | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 2,174 Nm³ H₂/h | View exact value2173.913043478261 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 1.69 kt H2/y | View exact value1.6948695652173913 kt H2/y | IEA Hydrogen Projects dataset | — | — |
Record history
2 current sourced values · 6 older values · Record updated