GH2 Ambès (Phase 1)
Overview
StatusDormantInternational Energy Agency · as of 2026
Country · regionFranceInternational Energy Agency · as of 2026
TechnologyALKInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity100 MW (planned first-phase electrolyzer capacity)
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis.
Details
Additional project information
Administrative AreaPort of Bordeaux (Bordeaux, Gironde, Nouvelle-Aquitaine, France)International Energy Agency · as of 2026
Capacity (MWel)100 MWelInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)21,739 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (Announced Size)100 MWInternational Energy Agency · as of 2026
Capacity (kt H2/y)16.9 kt H2/yInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- Hydrogen Central GH2 and the Port de Bordeaux announce largest hydrogen production unit project in New Aquitaine - Hydrogen Central
- International Energy Agency IEA Hydrogen Projects dataset Shared by 9 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- GH2 GH2 obtains state support for its electrochemical plant project on the Ambès peninsula
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | GH2 Ambès (Phase 1) | View exact valueGH2 Ambès (Phase 1) | GH2 and the Port de Bordeaux announce largest hydrogen production unit project in New Aquitaine - Hydrogen Central | Current | |
| Country | France | View exact valueFrance | IEA Hydrogen Projects dataset | — | — |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | ALK | View exact valueALK | IEA Hydrogen Projects dataset | — | — |
| Capacity | 100 MW (planned first-phase electrolyzer capacity) | View exact value100 MW (planned first-phase electrolyzer capacity) | GH2 obtains state support for its electrochemical plant project on the Ambès peninsula | Current | |
| Progress Status | Dormant | View exact valueDormant | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Port of Bordeaux (Bordeaux, Gironde, Nouvelle-Aquitaine, France) | View exact valuePort of Bordeaux (Bordeaux, Gironde, Nouvelle-Aquitaine, France) | IEA Hydrogen Projects dataset | — | — |
| Capacity (MWel) | 100 MWel | View exact value100 MWel | IEA Hydrogen Projects dataset | — | — |
| Capacity (Nm³ H₂/h) | 21,739 Nm³ H₂/h | View exact value21739.130434782608 Nm³ H₂/h | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 100 MW | View exact value100 MW | IEA Hydrogen Projects dataset | — | — |
| Capacity (kt H2/y) | 16.9 kt H2/y | View exact value16.94869565217391 kt H2/y | IEA Hydrogen Projects dataset | — | — |
Record history
1 current sourced value · 4 older values · Record updated