Project details

Status
inaugurated pilot facility
Sources (3)
  • pv magazine Global

    pv magazine Global

    Original value: inaugurated pilot facility

  • Corsica Sole switches on 150 kW electrolyzer at 12 MW solar plant

    pv magazine Global · As of 2026-09-21

    Original value: inaugurated pilot facility

    Original value: Folelli solar power plant, Corsica (Site: Folelli solar power plant, Corsica)

  • French developer testing 150 kW electrolyzer at 12 MW solar plant

    pv magazine Global · As of 2024-02-06

    Original value: 2025