H2Prism
Hydrogen calculators & data

Desert Bloom, phase 2

Australia · AU-NT Northern Territory

Overview

StatusConceptNorthern Territory Government
Country · regionAustraliaAustralian Government Department of Climate Change, Energy, the Environment and Water · AU-NT Northern TerritoryAustralian Government Department of Climate Change, Energy, the Environment and Water
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026HydrogenAustralian Government Department of Climate Change, Energy, the Environment and Water
Capacity7,600 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Project GroupDesert Bloom Hydrogen (phase 2)Australian Government Department of Climate Change, Energy, the Environment and Water
Project Typehydrogen production facilityAustralian Government Department of Climate Change, Energy, the Environment and Water

Capacity & economics

Production Volume390,000 t/year hydrogen (announced, anticipated production capacity)Australian Government Department of Climate Change, Energy, the Environment and Water
Total Capex13,600 A$ millions estimated project cost (announced, investment data)Australian Government Department of Climate Change, Energy, the Environment and Water

Location & names

Site NameTennant CreekAustralian Government Department of Climate Change, Energy, the Environment and Water
AliasCentral Australia Hydrogen ProjectAustralian Government Department of Climate Change, Energy, the Environment and Water
Official NameDesert Bloom HydrogenAustralian Government Department of Climate Change, Energy, the Environment and Water

Additional project information

Administrative AreaTennant CreekInternational Energy Agency · as of 2026
CountryAustraliaInternational Energy Agency · as of 2026
Progress StatusDormantInternational Energy Agency · as of 2026
Capacity (kt H2/y)1,317 kt H2/yInternational Energy Agency · as of 2026
Capacity (Announced Size)8 GW (phase 2: 7600 MW)International Energy Agency · as of 2026
Capacity (Nm³ H₂/h)1,688,889 Nm³ H₂/hInternational Energy Agency · as of 2026

Timeline

  1. Announcement : 2022-10-31Australian Government Department of Climate Change, Energy, the Environment and Water
  2. Target start of operation : 2026Northern Territory Government

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameDesert Bloom, phase 2
View exact valueDesert Bloom, phase 2
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Site NameTennant Creek
View exact valueTennant Creek
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Administrative AreaAU-NT Northern Territory
View exact valueAU-NT Northern Territory
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
AliasCentral Australia Hydrogen Project
View exact value[{"kind":"source_label","name":"Central Australia Hydrogen Project"}]
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
CountryAustralia
View exact valueAUS
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Official NameDesert Bloom Hydrogen
View exact value[{"lang":"en","name":"Desert Bloom Hydrogen","evidence":["E-01"]}]
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
ProductH2
View exact valueH2
IEA Hydrogen Projects dataset——
ProductHydrogen
View exact value수소
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Project GroupDesert Bloom Hydrogen (phase 2)
View exact value{"exists":true,"evidence":["E-01","E-02"],"group_name":"Desert Bloom Hydrogen","phase_name":"phase 2","phase_order":2}
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Project Typehydrogen production facility
View exact valuehydrogen_production_facility
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
Capacity7,600 MW
View exact value7600 MW
IEA Hydrogen Projects dataset——
Production Volume390,000 t/year hydrogen (announced, anticipated production capacity)
View exact value{"unit":"t/year","basis":"anticipated production capacity","nature":"발표","number":390000,"of_what":"hydrogen"}
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Total Capex13,600 A$ millions estimated project cost (announced, investment data)
View exact value{"unit":"A$ millions","basis":"investment data","nature":"발표","number":13600,"of_what":"estimated project cost"}
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventAnnouncement : 2022-10-31
View exact value{"date":"2022-10-31","tags":{"as_of":"2022-10-31","source":"State of Hydrogen 2022","evidence":["E-05"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-18T00:00:00Z"},"ev_type":"EV-01","event_id":"V-01","raw_date_text":"as of October 2022","date_precision":"day"}
Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventTarget start of operation : 2026
View exact value{"date":"2026","tags":{"as_of":"2022-01-05","source":"Northern Territory Government","evidence":["E-03"],"judged_by":"transcription","confidence":"high","accessed_at":"2026-08-18T00:00:00Z"},"ev_type":"EV-14","event_id":"V-02","raw_date_text":"targeting first export shipments from 2026","date_precision":"year"}
Northern Territory Government (https://newsroom.nt.gov.au/article/_nocache?id=61d5611364bd3ce194d941d7c4e03a3b); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Progress StatusConcept
View exact valueConcept
Northern Territory Government (https://newsroom.nt.gov.au/article/_nocache?id=61d5611364bd3ce194d941d7c4e03a3b); Australian Government Department of Climate Change, Energy, the Environment and Water (https://www.dcceew.gov.au/sites/default/files/documents/state-of-hydrogen-2022.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Administrative AreaTennant Creek
View exact valueTennant Creek
IEA Hydrogen Projects dataset——
CountryAustralia
View exact valueAustralia
IEA Hydrogen Projects dataset——
Progress StatusDormant
View exact valueDormant
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)1,317 kt H2/y
View exact value1316.7253333333335 kt H2/y
IEA Hydrogen Projects dataset——
Capacity (Announced Size)8 GW (phase 2: 7600 MW)
View exact value8GW (phase 2: 7600 MW)
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)1,688,889 Nm³ H₂/h
View exact value1688888.888888889 Nm³ H₂/h
IEA Hydrogen Projects dataset——

Record history

0 current sourced values · 17 older values · Record updated