Cromarty Green Hydrogen Production Facility
Electrolysis
- Capacity
- —
- Target operation
- 2029
- Technology
- Electrolysis
- Country
- —
- Development stage
- —
Target operation
- 2027
- 2028
- 2029
- 2030
- 2031
Target year as recorded for this project. The axis does not imply stage history.
Project details
- Reported size
- 15MW green hydrogen electrolysis facility located in Alness
- Product
- Hydrogen
- Function
- Production
- FID target
- December 2026
Sources (6)
- Cromarty Green Hydrogen Production Facility
Protium
Original value: Active development
Original value: Alness (Site: Alness)
Original value: 2029 (Operation event: commercial operations in 2029)
Original value: Water electrolysis (Technology: Water electrolysis)
- Protium Secures Future of Highland Green Hydrogen Economy
Protium
Original value: subject to the final stages of the planning process
- Protium
Protium
Original value: 15MW green hydrogen electrolysis facility located in Alness
Original value: Hydrogen (Product: Hydrogen)
Original value: 2029 (Operation event: operation start)
Original value: Production (Function: Production)
Original value: December 2026
- Cromarty Green Hydrogen Production Facility
Protium · As of 2026-08-03
Original value: 15MW green hydrogen electrolysis facility located in Alness
Original value: Hydrogen (Product: Hydrogen)
Original value: 2029 (Operation event: operation start)
Original value: Production (Function: Production)
Original value: December 2026
- WRc Group
WRc Group
Original value: 12 km north of Alness, next to Beinn Tharsuinn Wind Farm (Site: 12 km north of Alness, next to Beinn Tharsuinn Wind Farm)
- Scotland’s only HAR1 hydrogen project provides blueprint for future hydrogen developments
WRc Group · As of 2026-09-14
Original value: 12 km north of Alness, next to Beinn Tharsuinn Wind Farm (Site: 12 km north of Alness, next to Beinn Tharsuinn Wind Farm)