Chushul Microgrid
- Capacity
- —
- Target operation
- 2026
- Technology
- —
- Country
- —
- Development stage
- —
Target operation
2026Target operation
- 2024
- 2025
- 2026
- 2027
- 2028
Target year as recorded for this project. The axis does not imply stage history.
Project details
Sources (3)
- Inauguration of Solar Hydrogen based Microgrid at Chushul
NTPC Limited
Original value: 3.7 MW solar plant (Solar plant inaugurated rating)
Original value: Once fully operational
- NTPC Integrated Annual Report 2024-25
NTPC Limited
Original value: 2026-06
Original value: 1 MW electrolyser (Reported electrolyser electrical rating)
- Inauguration of Solar Hydrogen based Microgrid at Chushul
NTPC Limited · As of 2025-11-28
Original value: Once fully operational