Chushul Microgrid

Capacity
—
Target operation
2026
Technology
—
Country
—
Development stage
—

Target operation

2026Target operation
  1. 2024
  2. 2025
  3. 2026
  4. 2027
  5. 2028

Target year as recorded for this project. The axis does not imply stage history.

Project details

Sources (3)
  • Inauguration of Solar Hydrogen based Microgrid at Chushul

    NTPC Limited

    Original value: 3.7 MW solar plant (Solar plant inaugurated rating)

    Original value: Once fully operational

  • NTPC Integrated Annual Report 2024-25

    NTPC Limited

    Original value: 2026-06

    Original value: 1 MW electrolyser (Reported electrolyser electrical rating)

  • Inauguration of Solar Hydrogen based Microgrid at Chushul

    NTPC Limited · As of 2025-11-28

    Original value: Once fully operational