H2PrismHydrogen intelligenceSubscribe

Botnia Hydrogen production and refuelling station, Arvidsjaur

Alkaline · Sweden

Sweden Map: Natural Earth
Capacity
—
Target operation
Q4 2026
Technology
Alkaline electrolyser
Country
Sweden
Development stage
—

Target operation

2026Target operation
  1. 2024
  2. 2025
  3. 2026
  4. 2027
  5. 2028

Target year as recorded for this project. The axis does not imply stage history.

Project details

Reported size
0.5 MW alkaline electrolyser
Function
Refuelling
Announced schedule
Q4 2026
Sources (7)
  • Hydrogen for arctic vehicle testing

    Metacon

    Original value: Under development

    Original value: 0.5 MW alkaline electrolyser

    Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)

    Original value: Q4 2026

    Original value: Arvidsjaur (Site: Arvidsjaur)

    Original value: Q4 2026 (Operation event: operation start)

  • Metacon

    Metacon

    Original value: 0.5 MW alkaline electrolyser

    Original value: Alkaline electrolyser (Technology: Alkaline electrolyser)

    Original value: Q4 2026

    Original value: Q4 2026 (Operation event: operation start)

  • Arvidsjaur municipal authority board minutes

    Arvidsjaur municipality

    Original value: Refuelling (Function: Refuelling)

  • Arvidsjaur municipality

    Arvidsjaur municipality

    Original value: Refuelling (Function: Refuelling)

  • Hydrogen production and filling stations in Norrbotten are to support the transition to hydrogen and electricity

    Länsstyrelsen Norrbotten

    Original value: i uppstartsfas

  • Länsstyrelsen Norrbotten

    Länsstyrelsen Norrbotten

    Original value: start-up phase

  • Hydrogen production and filling stations in Norrbotten are to support the transition to hydrogen and electricity

    Länsstyrelsen Norrbotten · As of 2026-02-03

    Original value: start-up phase