Axpo Brugg
Overview
StatusCancelledInternational Energy Agency · as of 2026
Country · regionSwitzerlandInternational Energy Agency · as of 2026
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductH2International Energy Agency · as of 2026
Capacity15 MW (planned; announced 24 June 2022)
Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.
Details
Technology & product
Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Final UsePlanned supply to the nearby Voegtlin-Meyer hydrogen filling station for mobility (announced 24 June 2022)
Power SourcePlanned electricity supply entirely from the nearby Wildegg-Brugg run-of-river hydropower plant (announced 24 June 2022)
Additional project information
Administrative AreaBruggInternational Energy Agency · as of 2026
Capacity (Announced Size)15 MWInternational Energy Agency · as of 2026
Timeline
No recorded project events.
Sources & record history
Sources
- IEA Hydrogen Projects dataset Shared by 8 fields: Snapshot 2026-06-18 · Confidence: reported · Older value (2026)
- Axpo Hydrogen production facility at the Wildegg-Brugg hydropower plant forging ahead Shared by 3 fields: Current
Field sources
Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.
| Field | Shown value | Original value | Source | Date basis | Meaning |
|---|---|---|---|---|---|
| Name | Axpo Brugg | View exact valueAxpo Brugg | IEA Hydrogen Projects dataset | — | — |
| Country | Switzerland | View exact valueSwitzerland | IEA Hydrogen Projects dataset | — | — |
| Configuration Detail | Unknown PtX | View exact valueUnknown PtX | IEA Hydrogen Projects dataset | — | — |
| Final Use | Planned supply to the nearby Voegtlin-Meyer hydrogen filling station for mobility (announced 24 June 2022) | View exact valuePlanned supply to the nearby Voegtlin-Meyer hydrogen filling station for mobility (announced 24 June 2022) | Hydrogen production facility at the Wildegg-Brugg hydropower plant forging ahead | — | |
| Power Source | Planned electricity supply entirely from the nearby Wildegg-Brugg run-of-river hydropower plant (announced 24 June 2022) | View exact valuePlanned electricity supply entirely from the nearby Wildegg-Brugg run-of-river hydropower plant (announced 24 June 2022) | Hydrogen production facility at the Wildegg-Brugg hydropower plant forging ahead | — | |
| Product | H2 | View exact valueH2 | IEA Hydrogen Projects dataset | — | — |
| Technology | Other Electrolysis | View exact valueOther Electrolysis | IEA Hydrogen Projects dataset | — | — |
| Capacity | 15 MW (planned; announced 24 June 2022) | View exact value15 MW (planned; announced 24 June 2022) | Hydrogen production facility at the Wildegg-Brugg hydropower plant forging ahead | — | |
| Progress Status | Cancelled | View exact valueCancelled | IEA Hydrogen Projects dataset | — | — |
| Administrative Area | Brugg | View exact valueBrugg | IEA Hydrogen Projects dataset | — | — |
| Capacity (Announced Size) | 15 MW | View exact value15 MW | IEA Hydrogen Projects dataset | — | — |
Record history
3 current sourced values · 5 older values · Record updated