H2PrismHydrogen intelligenceSubscribe

Bahia H2 Offshore

PEM

Capacity
—
Target operation
2027
Technology
PEM electrolyser
Country
—
Development stage
—

Target operation

2027Target operation
  1. 2025
  2. 2026
  3. 2027
  4. 2028
  5. 2029

Target year as recorded for this project. The axis does not imply stage history.

Project details

Production pathway
Electrolysis
Product
Ammonia
Sources (7)
  • Awarded the “Bahía H2 Offshore” Project to transform offshore wind into fuel

    IHCantabria

    Original value: green ammonia (NH3)

  • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

    International Energy Agency · As of 2026-06-18

    Original value: PEM electrolyser (Technology: PEM electrolyser)

    Original value: Port of Santander (Site: Port of Santander)

    Original value: Ammonia (Product: Ammonia)

    Original value: 2027

  • Saitec Offshore Technologies

    Saitec Offshore Technologies

    Original value: Port of Santander; public-domain space of Santander Port Authority (Site: Port of Santander; public-domain space of Santander Port Authority)

    Original value: Conversion (Function: Conversion)

    Original value: Production (Function: Production)

  • Bahía H2 Offshore. Development of hydrogen and ammonia fuel generation system with offshore wind and photovoltaic energy

    Saitec Offshore Technologies

    Original value: Port of Santander; public-domain space of Santander Port Authority (Site: Port of Santander; public-domain space of Santander Port Authority)

    Original value: Conversion (Function: Conversion)

    Original value: PERTE ERHA / IDAE incentive programme under Recovery, Transformation and Resilience Plan; provisional 5.7 million EUR grant

    Original value: Production (Function: Production)

  • The Bahia H2 offshore project is presented in Santander

    Bahía H2 / Asime

    Original value: pilot R&D; phase-1 design/construction/installation/monitoring stated; operation not established

    Original value: Electrolysis (Pathway: Electrolysis)

    Original value: Cantabria, Spain (Site: Cantabria, Spain)

    Original value: avances logrados hasta la fecha ... incidencias técnicas ... próximos desafíos ... instalación y la puesta en marcha

    Original value: 2025 report: progress, technical incidents/solutions and next installation/commissioning steps; completion not established

    Original value: Research or pilot

    English rendering: progress achieved to date ... technical incidents ... upcoming challenges ... installation and commissioning

  • Bahía H2 / Asime

    Bahía H2 / Asime

    Original value: pilot R&D; phase-1 design/construction/installation/monitoring stated; operation not established

    Original value: Electrolysis (Pathway: Electrolysis)

    Original value: Cantabria, Spain (Site: Cantabria, Spain)

    Original value: avances logrados hasta la fecha ... incidencias técnicas ... próximos desafíos ... instalación y la puesta en marcha

    Original value: 2025 report: progress, technical incidents/solutions and next installation/commissioning steps; completion not established

    Original value: Research or pilot

    English rendering: progress achieved to date ... technical incidents ... upcoming challenges ... installation and commissioning

  • Bahía H2 Offshore obtains 5.7 million euros from PERTE ERHA to develop hydrogen and ammonia production technologies in harbor waters

    Port Authority of Santander

    Original value: intended maritime-vessel fuel supply; not demonstrated offtake

Related projects

Projects sharing a recorded country or technology.