Bahia H2 Offshore
PEM
- Capacity
- —
- Target operation
- 2027
- Technology
- PEM electrolyser
- Country
- —
- Development stage
- —
Target operation
- 2025
- 2026
- 2027
- 2028
- 2029
Target year as recorded for this project. The axis does not imply stage history.
Project details
- Production pathway
- Electrolysis
- Product
- Ammonia
Sources (7)
- Awarded the “Bahía H2 Offshore” Project to transform offshore wind into fuel
IHCantabria
Original value: green ammonia (NH3)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: PEM electrolyser (Technology: PEM electrolyser)
Original value: Port of Santander (Site: Port of Santander)
Original value: Ammonia (Product: Ammonia)
Original value: 2027
- Saitec Offshore Technologies
Saitec Offshore Technologies
Original value: Port of Santander; public-domain space of Santander Port Authority (Site: Port of Santander; public-domain space of Santander Port Authority)
Original value: Conversion (Function: Conversion)
Original value: Production (Function: Production)
- Bahía H2 Offshore. Development of hydrogen and ammonia fuel generation system with offshore wind and photovoltaic energy
Saitec Offshore Technologies
Original value: Port of Santander; public-domain space of Santander Port Authority (Site: Port of Santander; public-domain space of Santander Port Authority)
Original value: Conversion (Function: Conversion)
Original value: PERTE ERHA / IDAE incentive programme under Recovery, Transformation and Resilience Plan; provisional 5.7 million EUR grant
Original value: Production (Function: Production)
- The Bahia H2 offshore project is presented in Santander
Bahía H2 / Asime
Original value: pilot R&D; phase-1 design/construction/installation/monitoring stated; operation not established
Original value: Electrolysis (Pathway: Electrolysis)
Original value: Cantabria, Spain (Site: Cantabria, Spain)
Original value: avances logrados hasta la fecha ... incidencias técnicas ... próximos desafíos ... instalación y la puesta en marcha
Original value: 2025 report: progress, technical incidents/solutions and next installation/commissioning steps; completion not established
Original value: Research or pilot
English rendering: progress achieved to date ... technical incidents ... upcoming challenges ... installation and commissioning
- Bahía H2 / Asime
Bahía H2 / Asime
Original value: pilot R&D; phase-1 design/construction/installation/monitoring stated; operation not established
Original value: Electrolysis (Pathway: Electrolysis)
Original value: Cantabria, Spain (Site: Cantabria, Spain)
Original value: avances logrados hasta la fecha ... incidencias técnicas ... próximos desafíos ... instalación y la puesta en marcha
Original value: 2025 report: progress, technical incidents/solutions and next installation/commissioning steps; completion not established
Original value: Research or pilot
English rendering: progress achieved to date ... technical incidents ... upcoming challenges ... installation and commissioning
- Bahía H2 Offshore obtains 5.7 million euros from PERTE ERHA to develop hydrogen and ammonia production technologies in harbor waters
Port Authority of Santander
Original value: intended maritime-vessel fuel supply; not demonstrated offtake
Related projects