H2Prism
Hydrogen calculators & data

Aman - Green Hydrogen Project - phase 2

Mauritania

Overview

StatusCancelledInternational Energy Agency · as of 2026
Country · regionMauritaniaIslamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP
TechnologyOther ElectrolysisInternational Energy Agency · as of 2026
ProductAmmoniaInternational Energy Agency · as of 2026
Capacity12,500 MWInternational Energy Agency · as of 2026

Capacity values retain their recorded units and scope. MW, kt H₂/y and Nm³ H₂/h are different measures; this page does not convert or add them without a shared operating basis. “Other Electrolysis” and “Unknown PtX” are recorded classifications, not a specific electrolyzer design or power-to-X route.

Details

Technology & product

Configuration DetailUnknown PtXInternational Energy Agency · as of 2026
Project GroupAMAN (second phase of work)Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP
Project Typehydrogen production facilityIslamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP

Status & timeline

Date online (tracker field)2037 (meaning under review)International Energy Agency · as of 2026

Location & names

Official NameAMANIslamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP

Additional project information

Administrative AreaCentral MauritaniaInternational Energy Agency · as of 2026
CountryMauritaniaInternational Energy Agency · as of 2026
Capacity (Nm³ H₂/h)2,777,778 Nm³ H₂/hInternational Energy Agency · as of 2026
Capacity (Announced Size)15 GW (phase 2: 12.5 GW)International Energy Agency · as of 2026
Capacity (kt H2/y)2,166 kt H2/yInternational Energy Agency · as of 2026

Timeline

  1. Investment agreement signed : 2021-05Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP
  2. Suspension start : 2025-06-06HydroNews

Sources & record history

Sources

Field sources

Shared date, confidence and value status appear once with their source above; a dash in the table refers to that source context.

FieldShown valueOriginal valueSourceDate basisMeaning
NameAman - Green Hydrogen Project - phase 2
View exact valueAman - Green Hydrogen Project - phase 2
IEA Hydrogen Projects dataset——
CountryMauritania
View exact valueMRT
Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP (https://energies-petrole.gov.mr/sites/default/files/2023-02/glascow_joint_declaration.pdf); Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP (https://energies-petrole.gov.mr/sites/default/files/2023-02/glascow_joint_declaration.pdf); Mauritania Ministry of Energy and Petroleum (https://www.energies.gov.mr/en/node/2566); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Official NameAMAN
View exact value[{"lang":"en","name":"AMAN","evidence":["E-01"]}]
Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP (https://energies-petrole.gov.mr/sites/default/files/2023-02/glascow_joint_declaration.pdf); Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP (https://energies-petrole.gov.mr/sites/default/files/2023-02/glascow_joint_declaration.pdf); Mauritania Ministry of Energy and Petroleum (https://www.energies.gov.mr/en/node/2566); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Configuration DetailUnknown PtX
View exact valueUnknown PtX
IEA Hydrogen Projects dataset——
ProductAmmonia
View exact valueAmmonia
IEA Hydrogen Projects dataset——
Project GroupAMAN (second phase of work)
View exact value{"exists":true,"evidence":["E-01"],"group_name":"AMAN","phase_name":"second phase of work","phase_order":2}
Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP (https://energies-petrole.gov.mr/sites/default/files/2023-02/glascow_joint_declaration.pdf); Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP (https://energies-petrole.gov.mr/sites/default/files/2023-02/glascow_joint_declaration.pdf); Mauritania Ministry of Energy and Petroleum (https://www.energies.gov.mr/en/node/2566); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
Project Typehydrogen production facility
View exact valuehydrogen_production_facility
Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP (https://energies-petrole.gov.mr/sites/default/files/2023-02/glascow_joint_declaration.pdf); Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP (https://energies-petrole.gov.mr/sites/default/files/2023-02/glascow_joint_declaration.pdf); Mauritania Ministry of Energy and Petroleum (https://www.energies.gov.mr/en/node/2566); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
TechnologyOther Electrolysis
View exact valueOther Electrolysis
IEA Hydrogen Projects dataset——
Capacity12,500 MW
View exact value12500 MW
IEA Hydrogen Projects dataset——
EventInvestment agreement signed : 2021-05
View exact value{"date":"2021-05","tags":{"as_of":"2021-05","source":"Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy","evidence":["E-01"],"judged_by":"worker_review","confidence":"high","accessed_at":"2026-08-17T16:43:52Z"},"ev_type":"EV-04","event_id":"V-01","raw_date_text":"Recalling the signing in May 2021 of a Memorandum of Understanding between RIM and CWP Global","date_precision":"month"}
Islamic Republic of Mauritania Ministry of Petroleum, Mines and Energy; CWP (https://energies-petrole.gov.mr/sites/default/files/2023-02/glascow_joint_declaration.pdf); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventSuspension start : 2025-06-06
View exact value{"date":"2025-06-06","tags":{"as_of":"2025-06-06","source":"HydroNews reporting CWP CEO statement","evidence":["E-06"],"judged_by":"worker_review","confidence":"medium","accessed_at":"2026-08-17T16:43:52Z"},"ev_type":"EV-15","event_id":"V-02","raw_date_text":"CWP CEO Mark Crandall confirmed to Quantum Commodity Intelligence that the company has for the time being suspended AMAN","date_precision":"day"}
HydroNews (https://www.hydronews.it/en/the-off-takers-latan-and-cwp-global-slow-down-the-development-of-its-african-hydrogen-and-ammonia-green-projects/); H2Prism earlier record (SRC-C-P200); H2Prism earlier record (SRC-C-P200)Older value
EventDate online : 2037
View exact value{"date":"2037","date_precision":"year","event":"Date online","basis":"iea_hydrogen_projects_raw.csv"}
IEA Hydrogen Projects dataset——
Progress StatusCancelled
View exact valueCancelled
IEA Hydrogen Projects dataset——
Administrative AreaCentral Mauritania
View exact valueCentral Mauritania
IEA Hydrogen Projects dataset——
CountryMauritania
View exact valueMauritania
IEA Hydrogen Projects dataset——
Capacity (Nm³ H₂/h)2,777,778 Nm³ H₂/h
View exact value2777777.777777778 Nm³ H₂/h
IEA Hydrogen Projects dataset——
Capacity (Announced Size)15 GW (phase 2: 12.5 GW)
View exact value15GW (phase 2: 12.5 GW)
IEA Hydrogen Projects dataset——
Capacity (kt H2/y)2,166 kt H2/y
View exact value2165.6666666666665 kt H2/y
IEA Hydrogen Projects dataset——

Record history

0 current sourced values · 12 older values · Record updated

H2Prism separates published values from estimates. Check the linked source before you use a value. · Back to Hydrogen projects

Records are compiled with AI assistance. Original source links are shown when available.