Analysis · 4 min read
ACME Duqm Phase 1 and the Yara Ammonia Contract
Yara and GHC SAOC signed a binding agreement for 100,000 tons of renewable ammonia per year (Yara, Yara Clean Ammonia and ACME announcement, 2024-03-01).
Which phase the buyer named
Yara and GHC SAOC signed a binding agreement for 100,000 tons of renewable ammonia per year (Yara, Yara Clean Ammonia and ACME announcement, 2024-03-01). Yara identified Phase I in Duqm, Oman as the base-case source and expected supply from 2027 (H2Prism record).
In energy data modeling, isolating the Phase I boundary is essential to prevent commercial confusion. The H2Prism record lists Green Hydrogen and Chemicals Company SAOC Phase I. Separating Phase I from later phases ensures market analysts evaluate the contracted 100,000 tons per year against dedicated initial assets rather than pooling it with broader Duqm industrial plans.
Oman’s 2026 announcement deals separately with the later phases.
Sources
- [1] yara.com: Yara, Yara Clean Ammonia and ACME announcement
Last confirmed: 22 Nov 2026
From term sheet to binding agreement
The March 2024 contract followed an extended bilateral progression. In July 2022, Yara, ACME, and Scatec announced a preliminary term sheet for offtake from the first phase (Yara, 2022 term sheet announcement, 2022-07-15). That initial framework established preliminary intent across the consortium to assess renewable ammonia production and export logistics at Duqm.
Finalizing an enforceable agreement required 18 months of negotiations between the parties (Yara, Yara Clean Ammonia and ACME announcement, 2024-03-01). Yara said the agreement followed 18 months of talks during which regulatory and certification requirements evolved.
The corporate consortium also changed during this period. While Scatec participated alongside ACME and Yara in the 2022 term sheet, the 2024 binding agreement was concluded directly between Yara and ACME's GHC subsidiary. The announcement specified the annual volume and gave 2027 as the expected start in the base case. For analysts, this marked the transition from non-binding development intent to an actionable commercial commitment.
Sources
- [2] yara.com: Yara, 2022 term sheet announcement
Last confirmed: 22 Nov 2026
- [1] yara.com: Yara, Yara Clean Ammonia and ACME announcement
Last confirmed: 22 Nov 2026
What later Duqm agreements cover
Subsequent governmental disclosures defined an expanded scope for the Duqm site. On 10 June 2026, Oman's Foreign Ministry reported agreements covering the later phases of the complex (Oman Foreign Ministry, Duqm agreements, 2026-06-10). The disclosures outlined capital expenditure, physical production capacities, and commercial timelines for Phases II and III.
The Foreign Ministry described OMR 1.6 billion, equivalent to USD 4.2 billion, as the downstream investment for Phases II and III (Oman Foreign Ministry, Duqm agreements, 2026-06-10). For physical scope, the ministry stated a planned 400,000 metric tonnes per year of green ammonia and 71,000 metric tonnes per year of green hydrogen for each later phase. Across both later phases, the combined future design capacity reaches 800,000 metric tonnes per year of green ammonia.
The ministry projected commercial operation in 2030 for Phase II and 2033 for Phase III. H2Prism tracks the subsequent development under green hydrogen and chemicals spc phase ii former acme scatec oman. Analysts must keep H2Prism's Phase II schedule strictly separate from the original 2024 Yara ammonia purchase contract, as documented in the H2Prism record.
Sources
- [3] fm.gov.om: Oman Foreign Ministry, Duqm agreements
Last confirmed: 22 Nov 2026
How to read the capacity figures
Interpreting the disclosed metrics requires distinguishing contracted quantities from nameplate capacities and intermediate feedstocks.
Analysts should apply three principles when evaluating the Duqm data:
First, distinguish contracted volumes from nameplate capacity ratings. The 100,000 tons per year in the Yara contract is a contracted annual volume. Conversely, the 800,000 metric tonnes per year disclosed by Oman's Foreign Ministry is a combined future design capacity for Phases II and III (400,000 metric tonnes per year per phase). Analysts must treat this 800,000 metric tonnes per year strictly as a combined nameplate figure rather than an amount sold under commercial contract.
Second, separate feedstock inputs from chemical derivatives. The Foreign Ministry stated a planned 400,000 metric tonnes per year of green ammonia and 71,000 metric tonnes per year of green hydrogen per phase. Disclosures do not confirm the extent to which hydrogen serves as ammonia feedstock, so hydrogen and ammonia figures must be reported separately rather than adding hydrogen input volume to ammonia output.
Third, maintain distinct chronological and financial boundaries between phases. The USD 4.2 billion (OMR 1.6 billion) downstream investment, the 2030 Phase II date, and the 2033 Phase III date apply exclusively to the later phases. Yara’s March 2024 announcement specified the annual volume and gave 2027 as the expected start in the Phase I base case.
The following comparison details the commercial and technical boundaries separating the contract quantity from the announced capacity:
Commercial / Engineering Classification / Governing Phase / Specified Commodity / Disclosed Volume / Capacity Metric / Relevant Milestone Dates / Source Citation
| Commercial / Engineering Classification | Governing Phase | Specified Commodity | Disclosed Volume / Capacity Metric | Relevant Milestone Dates | Source Citation |
|---|---|---|---|---|---|
| Contract Quantity | Phase I (base-case source) | Renewable ammonia | 100,000 tons per year | Agreement announced: 2024-03-01; Expected start: 2027 | Yara, Yara Clean Ammonia and ACME announcement (2024-03-01); H2Prism record |
| Announced Capacity | Phases II and III | Green ammonia and green hydrogen | 400,000 mt/year ammonia and 71,000 mt/year hydrogen per phase (800,000 metric tonnes per year of planned ammonia capacity across phases II and III) | Agreements announced: 2026-06-10; Projected COD: 2030 (Phase II) and 2033 (Phase III) | Oman Foreign Ministry, Duqm agreements (2026-06-10); H2Prism record |
Sources
- [1] yara.com: Yara, Yara Clean Ammonia and ACME announcement
Last confirmed: 22 Nov 2026
- [3] fm.gov.om: Oman Foreign Ministry, Duqm agreements
Last confirmed: 22 Nov 2026
Isolating contracted purchase quantities from nameplate expansion targets, keeping feedstock flows distinct from chemical derivatives, and maintaining phase-specific database records allows analysts to evaluate the Duqm development accurately within the global clean ammonia market.