H2PrismHydrogen intelligenceSubscribe

All insights

Brief · 3 min read

Three hydrogen projects cancelled and four on hold or stalled, according to their sources

Owners, a port authority, an advocacy group and news outlets describe these seven projects as cancelled, on hold or stalled. The list is a sample of re-checked H2Prism records, not a market total.

Three cancelled projects

Sources describe three hydrogen projects in H2Prism's records as cancelled and four as on hold or stalled. Cancelled: AGIG's Hydrogen Park Murray Valley in Victoria, Air Products' liquid hydrogen facility in Casa Grande, Arizona, and the Inspira Madrid project. On hold or stalled: LSB Industries' green ammonia project at Pryor, Eneco's planned electrolyser in Rotterdam, SoCalGas's Angeles Link and the Pune Municipal Corporation's waste-to-hydrogen project. Three statements come from the owners, one from the Port of Rotterdam reporting the owner's statement, and three from a trade outlet, an advocacy group's blog and a local newspaper. This is a sample of records H2Prism re-checked against the original sources, not a complete list or a market total.

AGIG says that in June 2026 it decided not to proceed with Hydrogen Park Murray Valley in Victoria. Its project page still describes the planned plant as a 10 MW electrolyser; that figure is the design size of a plant that will not be built.

Air Products announced on June 30, 2026, in a release filed with the US Securities and Exchange Commission, that it "will discontinue a zero-carbon liquid hydrogen facility in Casa Grande, Arizona." The Spanish trade outlet Hidrógeno Verde reported on August 11, 2026 that with the dissolution of the company Inspira Madrid, the project is definitively cancelled.

Sources
  1. [1] AGIG: Hydrogen Park Murray Valley

    Last confirmed: 16 Nov 2026

  2. [2] Air Products and Chemicals, Inc.: Air Products Will Not Proceed with Louisiana Clean Energy (LCEC) Project; Company Will Record Pre-Tax Charge in Fiscal Third Quarter; Finalizing Agreement with Yara for Renewable Ammonia from NEOM Green Hydrogen Project in Saudi Arabia

    As of: 30 Jun 2026

    Last confirmed: 16 Nov 2026

  3. [3] Hidrógeno Verde: China and Saudi Arabia halt another green hydrogen project in Spain: a company set up to build a plant and five hydrogen stations in Madrid is wound up (in Spanish)

    As of: 11 Aug 2026

    Last confirmed: 16 Nov 2026

  4. [4] LSB Industries: Green Ammonia - LSB Industries

    Last confirmed: 16 Nov 2026

  5. [5] Port of Rotterdam: Planned 800-MW Eneco Electrolyser brings the target of 2.5 GW hydrogen production in 2030 closer | Port of Rotterdam

    Last confirmed: 16 Nov 2026

  6. [6] Environmental Defense Fund: California halts Angeles Link, but the need to decarbonize industry remains

    As of: 30 Apr 2026

    Last confirmed: 16 Nov 2026

  7. [7] The Bridge Chronicle: Pune: Hydrogen-from-Waste Project Faces Uncertainty Due to Financial Challenges

    As of: 20 Jan 2025

    Last confirmed: 16 Nov 2026

Four projects on hold or stalled

LSB Industries' green ammonia page says that as of October 2023 its project at Pryor is on hold. The Port of Rotterdam has added an update to its page on the planned Eneco Electrolyser saying that Eneco has put its plans for an electrolyser in Rotterdam on hold.

The Environmental Defense Fund wrote on its blog on April 30, 2026 that California regulators denied SoCalGas's request to recover costs for the next phase of the Angeles Link hydrogen pipeline, "effectively putting the project on hold." That description is EDF's; H2Prism does not cite a SoCalGas statement. The Bridge Chronicle reported on January 20, 2025 that financial uncertainties and a lack of grants had stalled progress on the Pune Municipal Corporation's waste-to-hydrogen project, leaving its future uncertain. The report does not use the term on hold, and it is nearly two years old.

Sources
  1. [4] LSB Industries: Green Ammonia - LSB Industries

    Last confirmed: 16 Nov 2026

  2. [5] Port of Rotterdam: Planned 800-MW Eneco Electrolyser brings the target of 2.5 GW hydrogen production in 2030 closer | Port of Rotterdam

    Last confirmed: 16 Nov 2026

  3. [6] Environmental Defense Fund: California halts Angeles Link, but the need to decarbonize industry remains

    As of: 30 Apr 2026

    Last confirmed: 16 Nov 2026

  4. [7] The Bridge Chronicle: Pune: Hydrogen-from-Waste Project Faces Uncertainty Due to Financial Challenges

    As of: 20 Jan 2025

    Last confirmed: 16 Nov 2026

Leaving paused and cancelled capacity out of totals

A total of planned capacity should count only projects that are still moving forward. Hydrogen Park Murray Valley shows why: AGIG's page still describes a 10 MW electrolyser, but AGIG has decided not to proceed, so adding those 10 MW to a total would count a plant that will not be built. On-hold projects are less clear, because a pause can end. For that reason H2Prism records on hold and cancelled as their own project stages, so a reader can leave both out of a pipeline total or show paused projects on their own line. A status changes when a source reports it, for example an owner announcing that a paused project has resumed or confirming that it has stopped. On the H2Prism dashboard, the stage filter can show projects recorded as on hold or cancelled. The dashboard's Active basis leaves out cancelled projects but still includes projects on hold, so remove them separately when building a total.

Sources
  1. [1] AGIG: Hydrogen Park Murray Valley

    Last confirmed: 16 Nov 2026

Explore related records

Research method

Research and writing were AI-assisted and reviewed before publication.