How capacity factor and curtailment affect hydrogen production cost

Higher capacity factor spreads annual fixed costs over more hydrogen, assuming constant efficiency. Curtailment can provide an opportunity to use electricity that would otherwise be reduced, but the price, available hours and connection costs determine whether it lowers hydrogen cost.

How operating hours change fixed cost per kilogram

Capacity factor is actual electricity consumed over a year divided by the electricity that would be consumed at rated power throughout that year. Equivalent full-load hours are capacity factor multiplied by 8,760 hours in a non-leap year. Actual hours switched on can be higher when the plant runs below rated power.

For a simple comparison, assume a 100 MW electrolyser consumes 55 kWh for each kilogram of hydrogen at all loads. At 4,380 equivalent full-load hours it uses 438,000 MWh and produces about 7.96 million kg. At 2,190 hours it produces about 3.98 million kg. These figures are illustrative assumptions, not observations of a specific plant.

Assume annual fixed costs of USD 13.19 million, including annualized capital and fixed operating costs. Dividing by output gives an estimated USD 1.66/kg at 4,380 hours and USD 3.31/kg at 2,190 hours. Halving output doubles fixed cost per kilogram only while the same annual fixed costs and constant efficiency are held unchanged.

Annual hydrogen (kg) = rated power (kW) x equivalent full-load hours / electricity use (kWh/kg). Fixed cost (USD/kg) = annual fixed costs (USD) / annual hydrogen (kg).

Sources
US Department of Energy

H2IQ Hour: Concentrated Solar Power as a Pathway for Electrolytic Hydrogen Production

Transcript: discussion of hydrogen cost versus annual operating hours and electricity price

Last confirmed: 2026-11-16

Compare inexpensive power with utilization

Curtailment means reducing available generation. An electrolyser may use some electricity that would otherwise be curtailed, subject to the actual grid, connection and commercial arrangements. A low wholesale price does not by itself establish the total delivered price to the electrolyser.

The following scenarios are invented for illustration. Each uses the same 100 MW plant, constant 55 kWh/kg and USD 13.19 million annual fixed costs. The electricity price is an assumed all-in price for electricity consumed. The result adds only fixed costs and electricity, so it is a partial cost estimate rather than a complete LCOH.

In these assumptions the 50% case costs less than the 15% case, even though its power costs more. Changing prices, hours or included costs can reverse that result. There is no universal winner, and the table does not imply that any operating pattern or tariff is typical.

Illustrative partial costs under assumed operating conditions

Capacity factorEquivalent full-load hours per yearHydrogen per yearAssumed power priceFixed costPower costPartial total
15%1,3142.39 million kgUSD 0/MWhUSD 5.52/kgUSD 0.00/kgEst. USD 5.52/kg
30%2,6284.78 million kgUSD 25/MWhUSD 2.76/kgUSD 1.38/kgEst. USD 4.14/kg
50%4,3807.96 million kgUSD 40/MWhUSD 1.66/kgUSD 2.20/kgEst. USD 3.86/kg
90%7,88414.33 million kgUSD 55/MWhUSD 0.92/kgUSD 3.03/kgEst. USD 3.95/kg

H2Prism assumptions, not market averages. Values are rounded independently; totals use unrounded components. Excludes water, variable maintenance, replacements, financing detail, taxes, storage, compression and delivery. Power cost uses half-up rounding to two decimals.

Sources
US Department of Energy

H2IQ Hour: Concentrated Solar Power as a Pathway for Electrolytic Hydrogen Production

Transcript: discussion of hydrogen cost versus annual operating hours and electricity price

Last confirmed: 2026-11-16

Include replacement and operational constraints

A full project model should include stack replacement assumptions and the timing of those costs. Runtime alone does not establish a replacement date: degradation, starts and stops, operating conditions, maintenance and manufacturer terms can also matter. Obtain project-specific evidence before assigning a replacement interval.

The simplified table holds annual fixed costs and efficiency constant. It does not model changing efficiency, downtime, part-load operation, extra equipment or the cost of a replacement. These omissions matter when comparing designs with different dispatch patterns.

Sources
US Department of Energy

H2IQ Hour: Concentrated Solar Power as a Pathway for Electrolytic Hydrogen Production

Transcript: discussion of hydrogen cost versus annual operating hours and electricity price

Last confirmed: 2026-11-16

Test the boundary before choosing a scenario

A DOE-published transcript of an NREL presentation describes the trade-off: operating only in low-price hours can leave electrolyzer capital costs spread over less hydrogen, while running more hours can mean buying higher-priced electricity. In that example the lowest-cost point depends on the electricity-price curve and the electrolyzer purchase cost. It does not establish one capacity factor for every project.

To compare a renewable-only case with grid or hybrid supply, use the same cost boundary and time period. Include delivery charges and any generation or storage costs once, either in the delivered electricity price or as separate project costs, to avoid double counting. Check whether the hourly supply is compatible with the intended hydrogen demand.

Use the H2Prism LCOH tools to explore assumptions, then compare the inputs and included costs against the project model. Treat these examples as a starting point for questions, not as a quote or forecast.

Sources
US Department of Energy

H2IQ Hour: Concentrated Solar Power as a Pathway for Electrolytic Hydrogen Production

Transcript: discussion of hydrogen cost versus annual operating hours and electricity price

Last confirmed: 2026-11-16

Common questions

Does free curtailed electricity guarantee low hydrogen cost?

No. If electricity is available for few hours, fixed costs are spread over fewer kilograms. Connection and other costs also matter.

Does halving capacity factor always double fixed cost per kilogram?

Only if annual fixed costs and hydrogen produced per unit of electricity remain unchanged, with no other change in the calculation.

Are equivalent full-load hours the same as hours switched on?

Not necessarily. A plant operating below rated power can be switched on for more hours than its equivalent full-load hours.