Uzbekistan

4 hydrogen projects are linked to Uzbekistan.

Uzbekistan Map: Natural Earth
Linked projects
4
Operational
1
FID / Construction
0

From plans to production

  1. Concept375%
  2. Operational125%

    Stage recorded for 4 of 4 projects.

    Sources

    Counts use the projects shown in this section's scope. Unknown stages are excluded from the distribution. Open a project for its sources.

    Projects by recorded capacity

    Projects with a positive capacity in MW. All stages are included.

    1. Allied Biofuels 2,400 MW
    2. Australia’s Allied Green Ammonia (AGA) SAF project in Uzbekistan 2,000 MW
    3. ACWA Power - Green H2 - Phase 2 (Tashkent project) 1,299 MW
    4. ACWA Power - Green H2 - Phase 1 (Tashkent project) 20 MW
    Sources

    Capacity comes from the linked project pages. Open a project to inspect its original sources.

    Connected projects

    Sources (2)
    • IEA Hydrogen Production Projects 2026

      International Energy Agency

      Original value: Location

    • IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)

      International Energy Agency · As of 2026-06-18

      Original value: Location