Argentina
9 hydrogen projects are linked to Argentina.
- Linked projects
- 9
- Operational
- 1
- FID / Construction
- 0
From plans to production
- Concept333.3%
- Feasibility111.1%
- Operational111.1%
- Dormant444.4%
Stage recorded for 9 of 9 projects.
Sources
Counts use the projects shown in this section's scope. Unknown stages are excluded from the distribution. Open a project for its sources.
Projects by recorded capacity
Projects with a positive capacity in MW. All stages are included.
- Fortescue Metals - Rio Negro, phase III 13,000 MW
- CPW Golfo San Jorge H2 production plant 6,200 MW
- Gaucho Wind to H2 and green ammonia 3,000 MW
- Fortescue Metals - Rio Negro, phase II 1,400 MW
- Fortescue Metals - Rio Negro, phase I 600 MW
Sources
Capacity comes from the linked project pages. Open a project to inspect its original sources.
Connected projects
View 9 projects
- Gaucho Wind to H2 and green ammonia Location
- CPW Golfo San Jorge H2 production plant Location
- Tierra del Fuego green hydrogen project Location
- Fortescue Metals - Rio Negro, phase III Location
- Hychico, Comodoro Rivadavia Location
- Plant H2- Pico Truncado Location
- Fortescue Metals - Rio Negro, phase II Location
- Pampas Location
- Fortescue Metals - Rio Negro, phase I Location
Sources (4)
- IEA Hydrogen Production Projects 2026 (preserved CSV edition, received 2026-10-24)
International Energy Agency · As of 2026-06-18
Original value: Location
- IEA Hydrogen Production Projects 2026
International Energy Agency
Original value: Location
- Honorable Congress of the Argentine Nation
Honorable Congress of the Argentine Nation
Original value: Location
- Law 27038 — City of Pico Truncado, National Capital of Hydrogen
Honorable Congress of the Argentine Nation
Original value: Location