H2PrismHydrogen intelligenceSubscribe

← All calculators

CalculatorsPower Cost and Hydrogen Price

Power Cost and Hydrogen Price

How the electricity price shows up in the hydrogen price: the power cost per kg, its share of the hydrogen price, the hydrogen price implied by an assumed share, and the power price a target hydrogen price can afford.

This address opens our calculator for electricity and hydrogen price scenarios. Open the current calculator.

Explore how production, installed capital costs and operating assumptions affect hydrogen cost. Add a selling price, tax and financing assumptions to examine the business case.

How the calculation works

In the annual model, gross LCOH equals the present value of included production costs divided by the present value of usable hydrogen output. Supported cost applies the selected support assumptions separately. Required selling-price metrics solve the relevant project or equity cash-flow condition. Production, replacements, degradation, construction timing and cost boundaries follow the selected case and model.

Inputs and defaults

A new PEM case uses 20 MW, 50% capacity factor, 53.3 kWh/kg SEC, installed CAPEX of USD 2,276.29/kW, electricity at USD 0.040573/kWh, fixed OPEX at 3% of CAPEX, 25 operating years and an 8% real discount rate. New cases use 1% annual efficiency degradation. These are editable model inputs, not a quote or an observed plant result; other pathways have different defaults.

Assumptions and limits

LCOH is a modeled cost, not a market price. Keep the installed-plant boundary, currency, price year and physical delivery point consistent. Project returns need a selling-price assumption. Tax and debt metrics depend on the selected finance stage, and a solver can report no solution or multiple solutions. A default or imported source record does not establish project eligibility or financeability.

Source inputs and example scenarios

The example combines inputs from several sources and model conversions; no single external calculator supplies the complete case. The 50% capacity factor and 1% annual efficiency degradation used for new cases and Reset are H2Prism scenario choices. They are not measured plant values or defaults taken from the external calculator manual. Existing saved, imported or shared cases retain their own values.

Frequently asked questions

How is LCOH different from hydrogen selling price?

LCOH allocates modeled production costs per unit of usable output. Selling price is a separate revenue assumption. Required selling price solves a specified cash-flow condition.

Are all pathways available in the screen?

The initial screen offers PEM, alkaline and SOEC electrolysis, plus SMR, SMR with CCS and ATR with CCS. Use only the pathways offered by the current interface.

Why do gross and supported hydrogen cost differ?

Gross cost excludes the selected support reductions. Supported cost applies those assumptions separately so their contribution remains visible.

Why can a return or required price be unavailable?

The result may need a selling price, completed installed-cost inputs or a different finance stage. A numerical search can also find no solution or more than one solution.

Can I use the defaults as a current project estimate?

Treat them as a starting scenario. Replace inputs with a consistent project basis and review every included cost and production assumption.

Sources